Philippines, United States Enhance Economic Ties Amidst Global Challenges

Pinagtitibay ng Pilipinas ang ugnayang pang-ekonomiya nito sa Estados Unidos sa pamamagitan ng pagbisita ng mga kinatawang mula sa US sa Maynila.

Philippines, South Korea Deposit Insurance Bodies Renew Info Sharing Pact

Ang PDIC at KDIC ay nag-sign ng MOU upang patibayin ang pagkakaisa sa insurance systems ng Pilipinas at South Korea.

Food, Water Security At The Core Of Government Climate Strategy

Ipinahayag ni Kalihim Maria Antonia Yulo Loyzaga ang pangako ng gobyerno sa seguridad ng pagkain at tubig sa harap ng pagbabago ng klima.

DOT To Travelers: Explore, Immerse In Philippines Rich Lent Traditions

Pahalagahan ang mga natatanging kaugalian ng Pasko ng Pagkabuhay. Simulan ang paglalakbay sa pisikal at espiritwal na kahulugan ng Lent sa Pilipinas.

MRT-3 Logs Highest Daily Ridership Of 400K Since Pandemic

The Metro Rail Transit Line 3 records its highest number of riders, counting to more than 400,000 since the pandemic.
By The Luzon Daily

MRT-3 Logs Highest Daily Ridership Of 400K Since Pandemic

6
6

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

A total of 400,182 passengers were served by the Metro Rail Transit Line 3 (MRT-3) on Wednesday, the highest single-day ridership of the rail line since it resumed operations on June 1, 2020 amid the Covid-19 pandemic.

The figure is higher than the previous single-day ridership of 396,345 recorded on Jan. 20, 2023.

“Ang pagtaas ng bilang ng mga pasaherong nabibigyang serbisyo ng MRT-3 ay patunay ng mas pinabuting serbisyo ng linya at maayos na pangangalaga at rehabilitasyon ng mga bagon at subsystems nito (The increase in the number of passengers served by the MRT-3 is a testament to its improved service, proper maintenance, and rehabilitation of train cars and subsystems),” a post from the official MRT-3 Facebook page read on Thursday.

The rehabilitation of the MRT-3 was completed on Dec. 2021 — increasing its highest train operating speed from 30 kilometers per hour (kph) to 60 kph and reducing the headway or time between trains from 8 – 9.5 minutes to 4 – 4.5 minutes during peak times.

“Umigsi din ang travel time ng tren mula North Avenue Station hanggang Taft Avenue Station sa 30-35 minuto mula 1 oras at 15 minuto (Train travel time also shorted from North Avenue Station up to Taft Avenue Station from the previous 1 hour and 15 minutes to 30 – 35 minutes),” it said.

MRT-3 Director for Operations Engr. Oscar Bongon said proper maintenance of the MRT-3 continues through the recent completion of the overhaul of all train cars.

“Makaaasa po ang publiko na higit pa pong pagbubutihin ng MRT-3 upang mas marami pang pasahero ang makinabang sa maayos at abot-kayang serbisyo ng ating linya (The public can rest assured that the MRT-3 will work harder to allow more passengers to experience the improved and affordable service of the rail line),” Bongon said.

He reminded passengers that health and safety protocols remain enforced at the MRT-3 such as wearing face masks, not talking, eating, drinking, or smoking, ensuring adequate ventilation, regular disinfection, barring passengers with Covid-19 symptoms and observance of physical distancing. (PNA)