DAR Gives Nearly 21K Land Titles, Condones Loans In Bicol

Mahalagang hakbang para sa mga magsasaka sa Bicol, halika't tanggapin ang husay ng agraryo.

Almost 5M Near-Poor Pinoys Benefited From DSWD’s AKAP In 2024

Sa ilalim ng AKAP, halos 5M na near-poor na Pilipino ang tumanggap ng tulong mula sa DSWD. Isang magandang simula para sa kanilang pag-unlad.

DHSUD To Release More 4PH Units To Beneficiaries In 2025

Abangan ang mas maraming yunit mula sa DHSUD para sa 4PH Program sa 2025, tumutulong sa mga Pilipino na makamit ang kanilang mga pangarap na tahanan.

Philippine Manufacturing Sector Records Strong Growth In 2024

Magandang balita para sa Pilipinas: Ang sektor ng pagmamanupaktura ay nagpakita ng malakas na paglago sa 2024.

President Marcos Orders ‘Integrated, Future-Proof’ Plans For Bicol River Basin

Inutusan ni Pangulong Marcos ang aksyon para sa pinagsamang proyekto ng Bicol River Basin.
By The Luzon Daily

President Marcos Orders ‘Integrated, Future-Proof’ Plans For Bicol River Basin

2946
2946

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

President Ferdinand R. Marcos Jr. on Wednesday directed concerned government agencies and local government units (LGUs) to collaborate to ensure an integrated and future-proof implementation of plans for the Bicol River Basin project.

Speaking at the distribution of government assistance to typhoon-affected farmers, fisherfolk, and families in Pili, Camarines Sur, Marcos said his directive would help prevent severe flooding amid the impact of climate change.

“Inaatasan ko ang DPWH (Department of Public Works and Highways), DENR (Department of Environment and Natural Resources), at DILG (Department of the Interior and Local Government) na makipagtulungan, kasama ang lokal na pamahalaan, upang maging integrated at future-proof ang kanilang mga plano at proyekto para sa Bicol River Basin (I instruct the DPWH, DENR, and DILG to work together, with the local government, to make their plans and projects integrated and future-proof for Bicol River Basin),” Marcos said.

The President said he has ordered the DPWH to revisit the Bicol River Basin Development Program.

The Master Plan and Feasibility Study for the project was finished in July and now includes adaptive measures for climate change.

“Sa kasalukuyan ay inaayos na ang Detailed Engineering Design na inaasahang masisimulan sa first quarter ng susunod na taon (Currently, the Detailed Engineering Design is being prepared which is expected to be implemented in the first quarter of next year),” the President said.

He instructed the DPWH, Department of Transportation, Department of Trade and Industry, and other agencies to ensure that infrastructures are well-researched and robust to make them durable and effective.

During his visit, he led the distribution of PHP50 million in assistance from the Office of the President, through the Department of Social Welfare and Development, to about 5,000 calamity victims in the province.

Bicol Region was badly hit when Severe Tropical Storm Kristine (international name Trami) dampened majority of Luzon from October 21 to 25, bringing record amounts of rainfall and triggering flooding and landslides. (PNA)