PBBM Wants Fast-Tracked Implementation Of Priority Projects

Ayon sa Malacañang, nais ni Pangulong Marcos na bilisan ang pagpapatupad ng mga prayoridad na proyekto ng kanyang administrasyon.

1621 Brings Thrilling Romantic Tension In New Single “Bababa”

With their single “Bababa,” 1621 brings forth a captivating narrative about the uncertainties of romance.

Culture Wars Pen Angry Letter On Rock N’ Roll Belter “Typical Ways”

Austin-based band Culture Wars gives fans a glimpse into their struggles with “Typical Ways,” available on all streaming platforms.

After The Comeback: Charting The 2028 Path For The Reform Bloc

The twin victories of Bam Aquino and Kiko Pangilinan mark not just a comeback, but a critical turning point for the reformist movement. As they prepare for 2028, the challenge is clear: transform momentum into meaningful governance, rebrand their approach, and evolve their connection with the Filipino people.

DOTr Vows Commercial Dev’t Of Lingayen Airport

The DOTr Secretary Tugade has assured Pangasinenses that the Lingayen airport will be developed into a commercial airport from its general aviation airport status.

DOTr Vows Commercial Dev’t Of Lingayen Airport

3
3

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Department of Transportation (DOTr) Secretary Arthur Tugade has assured Pangasinenses that the Lingayen airport will be developed into a commercial airport from its general aviation airport status.

“If we cannot finish it by the end of President Rodrigo Duterte’s term, at least we have already started it,” Tugade said in an interview here on Thursday.

He said the development of the Lingayen airport will start with the acquisition of land to increase its runway length and width.

“Pahahabain natin ang runway from 90 meters to 1.3 kilometers (km) to 1.5 km at yong width from 30 meters to 40 meters (We will extend its length from 90 meters to 1.3 kms. to 1.5 kms. and its width from 30 meters to 40 meters),” he added.

Tugade said they are working with the local government unit of Lingayen and the provincial government of Pangasinan to implement these improvements.

“Amid the pandemic, the asphalt overlay of (Lingayen airport) track, which commenced in 2018, was completed in August 2020. On the other hand, construction of (the) barbed wire perimeter fence of the Alaminos airport is already complete,” Tugade said in a Facebook post on Wednesday.

He said two “social tourism port projects” have already been completed in Pangasinan in the maritime sector.

Meanwhile, Governor Amado Espino III expressed excitement over the plan of the DOTr for the Lingayen airport.

Tugade is in Pangasinan to visit and inspect the Pangasinan North River landing, a project completed by the DOTr in 2018, and to conduct dialogues with the transport group in the province.

Lingayen Mayor Leopoldo Bataoil expressed gratitude for the projects accomplished in his town. (PNA)