Ilocos Norte LGU Urges Youth To Keep Oral Tradition Alive

Inilunsad ng Banna, Ilocos Norte ang isang kampanya para himukin ang mga kabataan na ipagpatuloy ang sinaunang tradisyon ng pagsasalaysay sa kanilang bayan.

Speaker Romualdez Vows Congress Funding For Solar Irrigation Projects

Ipinahayag ni Speaker Romualdez ang kanyang pangako sa pondo ng mga solar irrigation projects, nakatuon sa mga farmers ng Central Luzon.

Qualified Government Employees Get Midyear Bonus Starting May 15

Magsisimula na ang pag-release ng midyear bonus para sa mga qualified na empleyadong gobyerno mula Mayo 15.

Comelec: ‘Record’ Voter Turnout Logged In May 12 Midterm Polls

Naitala ng Comelec ang pinakamataas na turnout ng botante na 81.65% para sa midterm elections noong Mayo 12.

MRT-3 Rolls Out Another 4-Car Train After Holy Week Shutdown

The Metro Rail Transit Line 3 added another four-car train into its rolling stock following the rail service’s five-day maintenance shutdown during the Holy Week, increasing its passenger capacity.

MRT-3 Rolls Out Another 4-Car Train After Holy Week Shutdown

6
6

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Metro Rail Transit Line 3 (MRT-3) added another four-car train into its rolling stock following the rail service’s five-day maintenance shutdown during the Holy Week, increasing its passenger capacity.

The MRT-3 now has three four-car trains and 18 three-car trains ready for deployment at its mainline.

“Nakatutulong ang mas maraming train sets sa linya ng MRT-3 sa pagpapataas ng kapasidad ng linya upang mas maraming maisakay na mga pasahero (Having more train sets helps the MRT-3 increase its capacity and serve more passengers),” the MRT-3 said in a Facebook post Monday.

Each train car can carry up to 394 passengers, with three-car trains having a maximum passenger capacity of 1,186 and four-car trains with 1,576.

“Ang pagpapatakbo ng mas maraming train sets ay bunga ng matagumpay na pagmimintina ng mga bagon at pagsasailalim sa serye ng mga speed tests at quality checking sa mga ito noong maintenance shutdown (Having more trains running is the result of the successful maintenance and the facilitation of a series of speed tests and quality checking of train cars during the maintenance shutdown),” the post read.

The MRT-3 is now back in operation after it was closed to the public on Wednesday to make way for its annual maintenance and a crisis simulation exercise meant to train its personnel on how to respond during emergencies.

The exercise simulated a knife attack similar to the incident at a Keiō Railway train in Tokyo, Japan in October 2021. (PNA)