Pangasinan WWII Veterans Honored Thru Infra, Medical Programs

Ipinakita ng DND ang kanilang pangako sa mga beterano ng WWII sa Pangasinan sa pamamagitan ng mga programang pangkalusugan at imprastruktura.

Ilocos Norte Seeks 226 More Village Rangers To Prevent Forest Fires

Ang Ilocos Norte ay naglalayon na mag-hire ng 226 barangay rangers upang pangalagaan ang kanilang mga kagubatan mula sa sunog.

Ilocos Economic Growth Gets Boost With New SEC Laoag Office

Kasama ng bagong tanggapan ng SEC sa Laoag, umaasa ang mga taga-Ilocos sa mas mabilis na pag-unlad at mas matibay na regulasyon.

6 PMA Cadets To Join Foreign Service Academy

Panimula ng anim na kadete sa Foreign Service Academy mula sa Philippine Military Academy. Sila ay magiging mga future leaders.

Survey, Construction Of Davao River Bridge Project To Start Soon

The survey, design, and construction of the China-funded Davao River Bridge project are expected to start soon.
By The Luzon Daily

Survey, Construction Of Davao River Bridge Project To Start Soon

6
6

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The survey, design, and construction of the USD60 million China-funded Davao River Bridge project are expected to start soon.

Chinese companies and the Department of Public Works and Highways (DPWH) signed the commercial contract for the consulting services for the bridge’s detailed engineering design (DED) and construction supervision.

“After signing the Contract, the Consultant will carry out geotechnical investigation, geodesic surveys and data collection, and further complete the detailed engineering design The survey and design are scheduled to be completed within six months, and the construction supervision duration of the project is planned to be 24 months,” Chinese Ambassador Huang Xilian said on Tuesday.

“Looking forward to seeing the Davao River Bridge serve the local economic development and people’s livelihood at an early date,” he added.

The Davao River Bridge is located in the Bucana District, spanning over the east and west banks of the Davao River and connecting the coastal roads.

This two-way four-lane bridge will be 477 meters long with a total route length of 1,340 meters and will adopt a localized implementation mode, which means the Philippine side will be in charge of technical works and project management during the entire process.

Once completed, the bridge will accommodate more than 15,000 vehicles per day and significantly ease the traffic congestion in Davao City.

Huang said the project is also expected to employ about 300 to 500 locals during the peak construction period. (PNA)