DSWD-Calabarzon Disburses PHP5.13 Billion In Crisis Aid In 2024

Tulong mula sa DSWD-Calabarzon, PHP5.13 bilyon na ipinamahagi sa mga nangangailangan sa ilalim ng Crisis Intervention Program.

Over 100 Bicol Cops Recognized For Outstanding Service

Ang 101 na pulis sa Bicol ay pinarangalan sa kanilang natatanging kontribusyon. Isang hakbang patungo sa mas maayos na komunidad.

PNP Deploys 37K Cops For New Year Security Nationwide

Sa pagdiriwang ng Bagong Taon, 37,000 pulis ang naitalaga ng PNP para sa seguridad at kaayusan.

Philippine Posts One Of Highest Economic Growth In Asia In 2024

Kahit sa gitna ng tensyon, patuloy na lumalago ang ekonomiya ng Pilipinas. Isang magandang balita para sa bayan.

Aussie Firm To Build PH’s First Commercial Waste-To-Fuel Plant

Cyclion Holdings chooses the Philippines as the pioneer site for its groundbreaking waste-to-fuel project, revolutionizing sustainability and creating a cleaner future.


By PAGEONE Business Today

Aussie Firm To Build PH’s First Commercial Waste-To-Fuel Plant

6
6

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

Cyclion Holdings Pty Ltd has chosen the Philippines to be the first location in the world for the commercial operation of its waste-to-fuel project.

In its concept paper for its Philippine project, Cyclion said it eyes to process 900 tons per day (TPD) of municipal solid waste (MSW) to produce 52 million liters per annum of diesel and other fuels.

Cyclion has signed a memorandum of understanding (MOU) with the National Development Company (NDC) in Adelaide last Monday during the visit of Trade Secretary and NDC Chairperson Alfredo Pascual for the 6th Philippine-Australia Ministerial Meeting.

The NDC said its partner is initially raising USD5 million to finance the construction of the pilot plant by the last quarter of next year, which will have a capacity of processing 50 TPD of solid waste.

NDC General Manager Anton Mauricio said in a phone interview that the NDC is eyeing USD2.5-million investments for the pilot plant.

“At this early stage, it ticks all the boxes—pioneering, developmental, sustainable, and innovative,” Mauricio told the Philippine News Agency Thursday, noting that these are the reasons why the NDC is keen to invest in this startup project.

Mauricio also said that the project is scalable.

The project briefer noted that a 500-TPD project producing 35 million liters of diesel annually would cost USD65 million.

It noted that Quezon City, Manila and Caloocan are the hotspots for the project, based on the garbage these cities produce in a day.

According to the National Solid Waste Management Commission, in 2023, Quezon City is projected to produce over 2.76 million tons of solid waste, followed by Caloocan at 1.23 million tons and Manila at 1.15 million tons.

Mauricio said the facility will be located in Metro Manila to lessen transport cost.

He added that the waste-to-fuel plant will not use the burning method to convert the garbage to diesel that can be sold to industries. (PNA)