Regional Hospital To Expand Bed Capacity To 1.5K

Ang pagpapalawak ng R1MC ay tiyak na makikinabang ang mga residente sa Northern Luzon sa kanilang pangkalusugan.

Ilocos Norte Watermelon Clustered Farms Hit PHP9 Million Net Profit

Dahil sa bagong high-yielding na uri, nakamit ng mga magsasaka ng pakwan sa Ilocos Norte ang PHP9 milyon na kita. Isang malaking inspirasyon sa iba.

DOE, USAID Deploy Mobile Energy Units In Palawan

Isang makabagong inisyatiba mula sa DOE at USAID ang nagbigay ng Mobile Energy Systems sa Palawan upang tugunan ang pangangailangan sa kuryente.

DBM Oks 16K New Teaching Positions For SY 2025-2026

Nakatakdang magdagdag ng 16,000 bagong guro ang DBM para sa mga pampublikong paaralan sa susunod na school year.

NAIA Inaugurates Improved Runway, Expanded Terminal 2

The Ninoy Aquino International Airport (NAIA) will upgrade its runway and expand its terminal 2 with over PHP900 Million budget.

NAIA Inaugurates Improved Runway, Expanded Terminal 2

6
6

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The Manila International Airport Authority (MIAA) inaugurated on Tuesday the improved runway 13/31 at the Ninoy Aquino International Airport (NAIA), as well as the expanded NAIA Terminal 2.

More than PHP400 million was spent for the runway upgrade, while over PHP500 million was allocated for the Terminal 2 expansion.

“It only took more than a year to upgrade the runway. Because of the pandemic, fewer flights, and less people, the work was finished faster,” Media Affairs Division head Jess Martinez told the Philippine News Agency.

Martinez said the overlay and rehabilitation of the runway included putting of cement, as asphalt was previously used for the runway. The additional taxiway was also opened.

A taxiway would save time in terms of aircraft movements per hour because the aircraft would not need to wait or traverse the whole length of the runway, and just take the taxiway to exit, he noted.

All domestic and international flights could use this taxiway, although limited to the Airbus A321 and below types of aircraft, Martinez said.

He also pointed out that runway overlays should be done every three to four years.

With the recent upgrade, the next repair or upgrading maybe after six years, he said.

Meanwhile, an additional 2,800 square meters was used for the expansion of NAIA Terminal 2.

The expansion was mainly for the arrival and conveyor area, lobby, and check-in in the departure area. (PNA)