Five Core Principles Chef Tatung Follows That Every Chef Should Embrace

As a renowned chef, Chef Tatung’s wisdom extends beyond food, offering life principles that can help chefs become more well-rounded individuals. #LetsAllWelcome #LetsAllWelcome_ChefMykeTatungSarthou

‘Pilipinas Got Talent’ Season 7 Announces FMG, Donny, Eugene And Kathryn As New Judges

With FMG, Donny, Eugene, and Kathryn onboard, "Pilipinas Got Talent" is set to elevate the search for the country's brightest stars.

Melai And Robi Bring Fresh Fun To ‘Pilipinas Got Talent’ Comeback

Melai Cantiveros and Robi Domingo are back, bringing their winning charm to the renewed "Pilipinas Got Talent."

5 Desserts You Can Whip Up Fast

Transform your kitchen into a dessert haven with these simple creations. Here are five sweets that are sure to leave an impression without much effort.

NHA Allocates P20-M For Zambo Footbridge Project

By The Luzon Daily

NHA Allocates P20-M For Zambo Footbridge Project

3
3

How do you feel about this story?

Like
Love
Haha
Wow
Sad
Angry

The National Housing Authority (NHA) has allocated PHP20 million to build a concrete footbridge for those living in houses on stilts in one of the siege-affected barangays.

The recipient of the concrete footbridge project is Barangay Rio Hondo, one of the five most-affected barangays in the 2013 Zamboanga siege.

Rodrigo Pagotaisidro, City Housing and Land Management Division chief, said Saturday they are just waiting for the NHA to download the funds to the City Engineer’s Office, which is in charge of the implementation of the project.

The concrete footbridge will replace the existing wooden footbridge leading to the houses on stilts in Barangay Rio Hondo.

Pagotaisidro said the construction of a concrete footbridge is imperative to avert a repeat of an accident wherein government and NHA officials fell into the murky water as the wooden bridge collapsed.

The officials, Mayor Maria Isabelle Climaco-Salazar, then 1st district Congressman Celso Lobregat, Negros Occidental Congressman Alfredo Benitez, NHA and other officials were conducting an inspection on April 26, 2018, when the wooden footbridge collapsed.

Pagotaisidro said the City Engineer’s Office will start the work once the NHA will release the PHP20 million allocation.

Meanwhile, he said the wooden footbridge will be rehabilitated by the City Engineer’s Office while awaiting the release of the funds. (PNA)